Case Study: Early Childhood Center
Phillipsburg, New Jersey

PROJECT DATA

Project: Phillipsburg Early Childhood CenterArchitect: Design Resource Group
Program Manager: Heery International
Contractor: Jersey Solar
Grant by: BPU – Pilot Program
LEED Rating: Silver Certification

INSTALLATION DATA

Panel Coverage: 2,600 SF
System: PowerGuard / PowerLight
Panels: Sanyo 186CA5
Output: 22-27 kWpdc
Cost: $260,000
Completed: January 2007

TIDBITS

This photovoltaic assembly utilizes an innovative design to deliver clean solar energy.

There is only one roof penetration for the entire system.

The system is connected to the local energy grid.

It took approximately three weeks to install including panels, transformer and inverter connections.

The system will be incorporated into the school district’s science teaching curriculum.

Greg Nowell is a Program Director with Heery International
gnowell@heery.com
Heery.com

Rick Brooke is the Principal of NJ Solar and featured in this video
rickbrooke@comcast.net
JerseySolar.com

Video produced and edited by Ron Stanford
Stanford Creative